Plumbing is done (for now)

  We have completed the plumbing that will go beneath the concrete floors. The next step is using the excavator to finish leveling out the ground so that we don’t have to buy as much gravel. We still plan on getting 2 truckloads, but if we do it as it is right now part of the ground is above the concrete forms and will have no gravel and some needs a foot and a half of gravel. We just need to level it out. We ordered the excavator, now we just have to wait for it to arrive. Once it does we can order the gravel. I’m a tad bit excited.  

        
     