Day 2

Due to the heat and the children I have only been able to do an hour a day of work on leveling the outside of the house. I’ve gotten a lot done though. Seven wheelbarrow loads of hard packed clay moved already and two small sections leveled. I think we will actually hit our goal. If nothing else I am going to be all muscle by the time we are done with the tires!


Liked it? Take a second to support 0toHomestead on Patreon!
Become a patron at Patreon!

Leave a Reply