Last Sunday we started building the deck that will be outside the door on the second floor. We needed it there in order to move the door that has been underneath the scaffolding and we needed to move the door so we can take down the scaffolding so that we can finish backfilling next weekend. I think the most annoying thing about this job is how everything has to go in a particular order and if you don’t schedule things out right you are left with having to fill time with other jobs. It’s very stressful. Once the spray foam goes in timing doesn’t have to be as rigid.
this is the door under the scaffolding.
we built a deck! It will be bigger later but we want to get kore if the inside of the house done first.
this is midway of pulling the door up onto the deck. This was HARD and took us several days to recover. I’m not sure C is fully recovered yet. He was on the deck and I was underneath. He would pull and I would pick until it was up about 8 inches to a ft. Then C would hold it in place while I rushed to screw in small boards to hold it up. Pulling it up onto the deck was the hardest. He had to stand on the unfinished part of the deck and pull on a rope that was attacked to the handle while I pulled on the other handle that was on the foot long piece of deck, all while trying really hard not to drop it, and this door was HEAVY.
success!!! We have a door!!! It looks really nice. It even has blinds that are inside the glass. It was about a $2000 door that was returned to Lowe’s and sold to us for $600. I can that a huge win.
wow! Looking good! Your blog is so inspiring as we prepare to build our own house. Thanks for sharing!